Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...

La page est créée Gilles Courtois
 
CONTINUER À LIRE
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
„ CSCE Conference/Congrès SCGC Montreal
                  „ Financing: an infrastructure bank?
                  „ 40 years of Buckland & Taylor
                  „ Le tracel de Cap-Rouge

2013 | MAY/MAI

      Know-how: Savoir-faire:
Past and Present Passé et présent

                                         www.csce.ca
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
contents
                                               MAY 2013/MAI 2013 | VOLUME 30.2

 IN VIEW: PROJECTS
 10 Atwater Treatment Plant
 12 Le Tracel de Cap-Rouge
CSCE CONFERENCE/
CONGRÈS SCGC MONTREAL 2013                                            8
15 Conference preview

HISTORY NOTES/NOTES HISTORIQUES                                      10
21   The legacy of two engineers
23   Buckland & Taylor – 40 years
26   Remembering Dean C.J. Mackenzie
28   Saskatoon’s Broadway Bridge

FORUM ON SUSTAINABLE INFRASTRUCTURE/
FORUM SUR LES INFRASTRUCTURES DURABLES
19 A national infrastructure bank for Canada

NEWS, VIEWS & DEPARTMENTS /
NOUVELLES, POINTS DE VUE ET DÉPARTEMENTS
4 President’s perspective/Perspective presidentielle
6 From the regions: Western New Brunswick /
   De nos régions: l’Ouest du Nouveau-Brunswick
8 Student voice/La voix des étudiants
29 Lifelong learning/Formation continue
30 CSCE partners and sponsors/Associés et sponsors SCGC
                                                                     12

Canadian Civil Engineer | May 2013                                               3
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
Jim Kells,
                                                                                                          Ph.D., P.Eng., FCSCE, President CSCE/
                                                                                                          Ph.D., ing., FSCGC, Président SCGC
                                                                                                          PRESIDENT@CSCE.CA
                          CSCE/SCGC
                          4877 Sherbrooke St. W.,
                          Westmount, Québec H3Z 1G9
                          Tel.: 514-933-2634, Fax: 514-933-3504
                          E-mail: info@csce.ca       www.csce.ca
                                                                                 Our Infrastructure Challenge
PRESIDENT/PRÉSIDENT
Jim Kells, Ph.D., P.Eng., FCSCE (Saskatoon, SK)
PRESIDENT ELECT/PRÉSIDENT DÉSIGNÉ
                                                                                 I  nfrastructure is at the heart of much of
                                                                                    what civil engineering is all about. It
                                                                                 includes roads, bridges, pipelines, water
Yves Cadotte, ing., (Montreal, QC)                                               treatment and distribution systems, sewage
                                                                                 collection and treatment systems, energy
CANADIAN CIVIL ENGINEER/L’INGÉNIEUR CIVIL CANADIEN
                                                                                 supply and distribution systems, communi-
EDITOR/RÉDACTEUR
Doug Salloum, CSCE Executive Director                                            cations networks, and so on. Much of it is
514-933-2634 x 24, doug.salloum@csce.ca                                          invisible to most people until such time as it
                                                                                 fails to function as intended.
MANAGING EDITOR/                        ASSOCIATE EDITOR/                          We have increasingly heard about the state
DIRECTEUR DE LA RÉDACTION               RÉDACTEUR EN CHEF ADJOINT
Cindy Macdonald                         Bronwen Parsons                          of our nation’s infrastructure and the need
Tel.: 416-510-6755                      Tel.: 416-510-5119
cmacdonald@bizinfogroup.ca              bparsons@ccemag.com
                                                                                 to focus attention on what is now well-es-
                                                                                 tablished as an infrastructure deficit. Here,
ADVERTISING SALES/                      ART DIRECTOR/
PUBLICITÉ                               COMPOSITION ARTISTIQUE                   deficit refers to the difference in actual an-
Maureen Levy                            Stewart Thomas                           nual expenditures on infrastructure (e.g.,
Tel: 416-510-5111                       Tel: 416-510-5600 x3212
mlevy@ccemag.com                        sthomas@bizinfogroup.ca                  new construction, maintenance work, etc.)
                                                                                 and the expenditures needed to maintain and
Annual Subscription Rates/Abonnement annuel                                      expand our infrastructure for good service.
Canada & U.S./E.U. $35.00, Other countries/Autres pays $45.00; Single
copy/Un numéro $7.50; Agency discount/Rabais au distributeurs 10%                In the first-ever infrastructure report card for
PUBLICATION ISSN 9825-7515                                                       Canada, which focused on municipal roads
RETURN ADDRESS/ADRESSE DE RETOUR :                                               and water systems, it was estimated that
The Canadian Society for Civil Engineering
La Société Canadienne de Génie Civil                                             more than $170 billion is needed to bring          Engineers (Failure to Act: The Impact of Cur-
4877 Sherbrooke St. W., Westmount, Quebec H3Z 1G9

Canadian Civil Engineer (CCE) is published five times per year by the Canadian
                                                                                 the infrastructure up to standard. This is         rent Infrastructure Investment on America’s
Society for Civil Engineering (CSCE). L’ingénieur Civil Canadien (ICC) est       staggering!                                        Economic Future). A key finding in both
publié cinq fois par année par la Société Canadienne de Génie Civil (SCGC).

The opinions expressed in the papers are solely those of the authors and the
                                                                                   Failure to address the infrastructure deficit    reports is that, in addition to infrastructure
Canadian Society for Civil Engineering is not responsible for the statements     will inevitably result in further deterioration    condition being important for public safety,
made in this publication. Les opinions exprimées dans les articles sont la
seule responsabilité de leurs auteurs et la Société canadienne de génie civil    in service, overall increases in long-term ex-     there is a strong connection between invest-
n’engage pas sa responsabilité dans les propos exprimés.

CIVIL Magazine is produced by the publishers of Canadian Consulting
                                                                                 penditures, reduced economic performance           ments in public infrastructure and economic
Engineer Magazine, published by BIG Magazines LP, a division of Glacier BIG      and, in turn, a reduced quality of life. The       productivity and prosperity, as expressed
Holdings Ltd. Le magazine Civil est produit par l’editeur de la publication
Canadian Consulting Engineer qui est publie par BIG Magazines LP, une            economic impacts have been clearly ar-             by such metrics as levels of employment,
division de Glacier BIG Holdings Ltd.

Business Information Group,
                                                                                 ticulated in two recent reports, one with          gross domestic product and international
80 Valleybrook Drive,                                                            a Canadian context by the Canada West              competitiveness.
Toronto, Ontario M3B 2S9
Tel.: 416-442-5600; Fax: 416-510-5140                                            Foundation (At the Intersection: The Case for        So, where do we go from here? While
PUBLICATIONS MAIL AGREEMENT/POSTES CANADA ENREGISTREMENT #40069240               Sustained and Strategic Public Infrastructure      civil engineers have developed tremen-
                                                                                 Spending) and the other with an American           dous expertise at ensuring that the design
                                                                                 context by the American Society of Civil           and construction of infrastructure is done

4                                                                                                                                            Mai 2013 | L’Ingénieur civil canadien
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
PRESIDENT’S PERSPECTIVE | PERSPECTIVE PRÉSIDENTIELLE

right, we have often been silent or not even                            are essential; simply throwing more money               deed, we would hope that the next federal
a part of the decisions related to whether                              at the problem is not a viable option. To               infrastructure program, anticipated in 2014,
it is the right infrastructure that is being                            this end, it is necessary that the principles           would make a direct link between the fund-
built. Moreover, we have perhaps not been                               of asset management, life cycle analysis and            ing provided and the principles just noted,
as much a part of an innovation strategy as                             sustainability must be incorporated into                so that they are factored into each and every
should be the case. Here, it is suggested that                          all of our work on a go-forward basis. In-              approved project. „
design conservatism has often led us to re-
sort to standard approaches to the problems
at hand. With an increasing infrastructure                              Notre défi en matière d’infrastructures
deficit, it is clear that innovative strategies

                                                                        L     es infrastructures sont au cœur d’une
                                                                              bonne partie de ce qu’est le génie civil.
                                                                        Cela inclut les routes, les ponts, les pipelines, les
                                                                                                                                été fait par la « American Society of Civil
                                                                                                                                Engineers (Failure to act: the impact of cur-
                                                                                                                                rent infrastructure investment on America’s
                                                                        usines de traitement des eaux, les aqueducs, les        economic future). » L’une des principales con-
                                                                        réseaux d’égouts, les systèmes de production et         statations des deux rapports est le fait qu’en
                                                                        de transport d’énergie, les réseaux de commu-           plus de l’importance de l’état des infrastruc-
                                                                        nication, etc. Une bonne partie de ces ouvrages         tures pour la sécurité du public, il y a un
                                                                        passe inaperçu pour la plupart des gens, jusqu’à        lien étroit entre les investissements dans les
                                                                        ce qu’une panne survienne.                              infrastructures publiques et la productivité
                                                                          Nous avons beaucoup entendu parler de                 et la prospérité, en termes d’emplois, de PIB
                                                                        l’état de nos infrastructures et de l’urgence           et de capacité concurrentielle internationale.
                                                                        de se préoccuper de notre déficit en matière              Où en sommes-nous dans ces circon-
                                                                        d’infrastructures. Ce déficit est en fait la            stances ? Même si les ingénieurs civils ont
                                                                        différence entre le chiffre de nos dépenses             créé d’impressionnantes compétences en
                                                                        annuelles en infrastructures (ex. : nouvelles           matière de conception et de construction
                                                                        constructions, dépenses d’entretien, etc.)              des infrastructures, nous avons souvent omis
                                                                        et les dépenses qu’exigent le maintien et le            d’étudier ou même de participer aux déci-
                                                                        développement de nos infrastructures. Dans              sions relatives à la pertinence des choix en
                                                  Photo by Jim Kells.

                                                                        un premier bulletin publié sur l’état des in-           matière d’infrastructures. En outre, nous ne
                                                                        frastructures au Canada, qui porte sur les              nous sommes peut-être pas assez préoccupé
                                                                        routes et les aqueducs municipaux, on évalue            des stratégies d’innovation. Il semblerait ici
                                                                        à plus de 170 milliards de dollars le montant           que le conservatisme dans la conception
An example of aging infrastructure: Built                               nécessaire pour remettre à niveau nos infra-            nous ait souvent porté à conserver des solu-
in 1907, the Victoria Bridge (Traffic Bridge)                           structures. Voilà qui est renversant !                  tions traditionnelles face aux problèmes à
in Saskatoon was closed to traffic in                                     Ne pas régler ce déficit en matière                   régler. Devant un déficit croissant en matière
2010 due to safety concerns. The City of                                d’infrastructures provoquera inévitablement             d’infrastructures, il est évident qu’il faut éla-
Saskatoon is currently examining options                                une détérioration additionnelle des servic-             borer des stratégies novatrices ; le simple fait
for replacing the bridge which range                                    es, une hausse globale des dépenses à long              de consacrer plus d’argent aux problèmes n’est
in cost from $26 million to $60 million./                               terme, une diminution de la performance                 pas une solution valable. Ici, il faut absolument
Un exemple de nos infrastructures                                       économique, et une diminution de notre                  incorporer dans notre démarche les principes
vieillissantes : inauguré en 1907, le pont                              qualité de vie. Les impacts économiques ont             de gestion de l’actif, d’analyse du cycle de vie
Victoria (pont Traffic), à Saskatoon, a été                             été très bien décrits dans deux rapports ré-            et de durabilité. En fait, nous souhaiterions
fermé à la circulation en 2010 par souci                                cents, dont l’un évoque le contexte canadien            que le prochain programme fédéral en matière
de sécurité. La ville de Saskatoon étudie                               et a été fait par la « Canada West Founda-              d’infrastructures, prévu pour 2014, crée un
présentement les diverses solutions pour                                tion (At the intersection: the case for sustained       lien direct entre le financement et les principes
remplacer ce pont, dont les coûts vont                                  and strategic public infrastructure spending) »         évoqués ci-dessus, afin qu’ils fassent désormais
de 26 millions à 60 millions de dollars.                                et l’autre évoque le contexte américain et a            partie de tout projet approuvé. „

Canadian Civil Engineer | May 2013                                                                                                                                             5
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
FROM THE REGIONS: SECTION NEWS | DE NOS RÉGIONS : NOUVELLES DES SECTIONS

                                                                           tive director, Doug Salloum. This event was well received by those
Rebuilding the Western                                                     who attended and the organizing committee looks forward to hosting
                                                                           similar dinners on an annual basis.
New Brunswick Section                                                        Looking to the future, the Western New Brunswick Section also ar-
                                                                           ranged to send a representative to the CSCE fall board meeting held in
                                                                           December in Montreal. This provided an opportunity for the Section
                                                                           to have direct contact with the CSCE national executive and national
                         Susann Hickey, P.Eng., MCSCE, FEC                 office staff and to network with representatives from other sections and
                         VICE-PRESIDENT, CSCE ATLANTIC REGION              bring new ideas home. The Western New Brunswick Section has been
                         Susann Hickey, ing., MSCGC, FEC                   quite active in the past and is looking forward to continuing to provide
                         VICE-PRÉSIDENTE,                                  opportunities to the local membership in the coming years. „
                         RÉGION ATLANTIQUE DE LA SCGC
                                                                           Susann Hickey is Regulatory Manager, St. John’s, WorleyParsons Canada.

T     he Atlantic Region of CSCE covers the geographic area of the
      four Atlantic provinces: Newfoundland and Labrador, Nova
Scotia, New Brunswick and Prince Edward Island. The Western                Reconstruire la section de
New Brunswick Section, after a period of inactivity, has been mak-
ing significant effort to rebuild over the last six months. The existing   l’Ouest du Nouveau-Brunswick
Section executive members are actively looking at bringing new
people into the executive committee and have a goal to have a new
Section chair in place in 2013.
  In 2012, this section took on the task of organizing an evening din-
                                                                           L    a région atlantique de la SCGC comprend les quatre provinces
                                                                                atlantiques : Terre-Neuve et Labrador, Nouvelle-Écosse, Nouveau-
                                                                          Brunswick et Île-du-Prince-Édouard. Après une période d’inactivité, la
ner to provide networking opportunities to students at the University     section de l’Ouest du Nouveau-Brunswick s’est lancée dans un important
of New Brunswick (UNB) Student Chapter and the local business             travail de reconstruction depuis six mois. Les membres de l’exécutif de
community. The dinner took place in October 2012 at the Wu Cen-           la section cherchent à attirer de nouveaux membres au sein de l’exécutif
tre located on the Fredericton campus of UNB and was attended by          et comptent bien avoir un nouveau président en 2013.
70 people, including approximately 20 from the Fredericton business         En 2012, la section a organisé un dîner pour permettre aux étudi-
community. The guest speaker for the event was the CSCE’s execu-          ants de l’Université du Nouveau-Brunswick de se faire un réseau au
                                                                                     sein de la communauté locale des affaires. Le dîner a eu lieu
                                                                                     en octobre 2012 au Centre Wu, situé sur le campus de Fred-
                                                                                     ericton de l’UNB et a attiré 70 personnes, dont 20 membres
                                                                                     du monde des affaires de Fredericton. Le conférencier invité
                                                                                     pour l’occasion était le directeur exécutif de la SCGC, Doug
                                                                                     Salloum. Cette initiative a été fort appréciée des participants
                                                                                     et devrait se répéter à chaque année.
                                                                                       La section de l’Ouest du Nouveau-Brunswick a également
                                                                                     envoyé un représentant à la réunion d’automne du c.a. de la
                                                                                     SCGC, à Montréal, en décembre dernier, ce qui a permis à
                                                                                     la section d’établir un contact direct avec l’exécutif national
University of New Brunswick CSCE Student Chapter executive with Doug                 et la permanence de la SCGC, de rencontrer des représent-
Salloum, CSCE executive director, at the Fredericton meeting./La direction de        ants d’autres sections, et de faire le plein d’idées nouvelles.
la section étudiante de la SCGC de l’Université du Nouveau-Brunswick, en             La section de l’Ouest du Nouveau-Brunswick a déjà été très
compagnie de Doug Salloum, directeur exécutif de la SCGC, lors de la réunion         active et compte offrir toutes sortes d’occasions aux mem-
de Fredericton. From left to right/De gauche à droite: Dr. Trevor Hanson,            bres locaux au cours des prochaines années. „
Garrett Proud, Myran McLaughlin, Jessica Pottier, Rachel Van Wart, Doug
Salloum, Kelsey Morrissey, Elizabeth Calvin, Krista Flanagan, Paul Carson.           Susann Hickey est directrice de la réglementation au bureau de
Missing is Dylan Robertson./Dylan Robertson n’apparaît pas sur la photo.             St. John’s de WorleyParsons Canada.

6                                                                                                             Mai 2013 | L’Ingénieur civil canadien
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
THE STUDENT VOICE | LA VOIX DES ÉTUDIANTS

                       Spirits high at student competitions
                                              Amie Therrien, P. Eng, M. Eng., MCSCE              Another big event on the calendar is the CSCE Annual Conference
                                              STUDENT AND YOUNG PROFESSIONALS                  in Montreal from May 29 to June 1. Each competition discussed
                                              PROGRAM COORDINATOR, CSCE                        above will be sending two members of the winning teams to the con-
                                              Amie Therrien, ing, M. Eng., MSCGC               ference to receive their awards from CSCE. There will also be a great
                                              COORDONNATRICE, PROGRAMME DE LA                  program of events specifically for students and young professionals
                                              SCGC POUR ÉTUDIANTS ET JEUNES                    this year, in addition to all the great speakers, paper presentations,
                                              PROFESSIONNELS                                   and activities that make up the conference. Please visit http://www.
                                                                                               csce2013.ca/young_professionals for more information. „

                       I  n late January, more than 400 engineering students from across
                          the country came to Vancouver for the Great Northern Concrete
                       Toboggan Race (GNCTR) hosted by the University of British Co-
                                                                                               Amie Therrien can be reached at yp@csce.ca

                       lumbia. They presented their toboggans, the culmination of months
                       of hard work, to the judges, raced them down Mount Seymour, and
                       partied like there was no tomorrow. Congratulations to the team         Des concours étudiants qui
                       from the University of Western Ontario who took home the CSCE
                       Cup as overall winner. Western will be defending champions as well      suscitent l’enthousiasme
                       as the host team for next year’s competition (gnctr2014.com).
                         We also saw students gather in Montreal at the beginning of March
                       for the 29th Annual CSCE Troitsky Bridge Building Competition. As
                       always, Concordia did a wonderful job of organizing and hosting the
                                                                                               À     la fin de janvier, plus de 400 étudiants en génie de tous les
                                                                                                     coins du pays se sont rendus à Vancouver pour la grande course
                                                                                               nordique en toboggan de béton (Great Northern Concrete Toboggan
                       event, which had more than 25 teams build bridges, present them to      Race - GNCTR), sous les auspices de l’Université de la Colombie-
                       judges, then watch as they endured the Crusher. Watch troitsky.ca for   Britannique. Ils ont soumis aux juges leurs toboggans, aboutissement
                       information on how to get involved in next year’s competition.          de mois de travail intense, ont dévalé la pente du mont Seymour, et
                         Last, but not least, we’ve got the Canadian National Concrete Canoe   célébré dignement l’événement. Félicitations à l’équipe de l’Université
                       Competition (CNCCC), which is being hosted in Montreal by École         Western Ontario qui a remporté la coupe de la SCGC à titre de grand
                       de technologie supérieure (ETS) from May 17-19. It will be a fun and    gagnant. Western défendra son championnat et accueillera l’activité
                       exciting event. Check out concretecanoe.com for more details.           en 2014 (gnctr2014.com).

                                                                                                                                                                         © 2013 Hao Yin Photography
Photo: Amie Therrien

                       Carsteel Manufacturing Ltd. Team Legacy from University of              CSCE Cup winners, Les Imponderables, from CEGEP de Chicoutimi,
                       Calgary pose for a picture while building their bridge./L’équipe        cheer on their bridge as it faces the Crusher./ Gagnants de la
                       Carsteel Manufacturing Ltd. de l’Université de Calgary prend la         coupe de la SCGC, Les impondérables, du CEGEP de Chicoutimi,
                       pose tout en construisant son pont dans le cadre du concours.           saluent leur chef d’œuvre qui va passer sous l’écraseur.

                       8                                                                                                         Mai 2013 | L’Ingénieur civil canadien
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
THE STUDENT VOICE | LA VOIX DES ÉTUDIANTS
© 2013 RMKing Photography

                                                                                                                                                                                                                                     © 2013 RMKing Photography
                            A group of students from McMaster University show their                          The WETT Vikings from the University of Western Ontario
                            excitement for GNCTR./Un groupe d’étudiants de l’Université                      accept the CSCE Cup./Les « WETT Vikings », de l’Université
                            McMaster témoignent de leur enthousiasme pour le concours.                       Western Ontario, gagnants de la coupe de la SCGC.

                              D’autres étudiants se sont aussi réunis à Mon-                                                                                        Autre activité importante au calendrier :
                            tréal au début de mars pour le concours de pont                                                                                       le congrès annuel de la SCGC, qui aura lieu
                            Troitsky de la SCGC. Comme d’habitude,                                                                                                à Montréal, du 29 mai au 1er juin. Tous les
                            Concordia a bien organisé l’événement au cours                                                                                        concours mentionnés ci-dessus enverront deux
                            duquel plus de 25 équipes ont soumis leurs                                                                                            membres de l’équipe gagnante au congrès pour

                                                                                                                                      © 2013 RMKing Photography
                            chefs d’œuvre aux juges avant de les voir suc-                                                                                        recevoir leurs prix. Également au programme :
                            comber sous le poids de l’écraseur. Consultez                                                                                         diverses activités pour les étudiants et les jeunes
                            le site troitsky.ca pour savoir comment vous                                                                                          professionnels, en plus des conférenciers éméri-
                            inscrire au concours de l’an prochain.                                                                                                tes, des communications et des activités qui
                              Enfin, il y a le concours national de canot                                                                                         constituent l’essentiel du congrès. Visitez le site
                            en béton (Canadian National Concrete Ca-           Even superheroes make time for GNCTR!                                              http://www.csce2013.ca/young_professionals
                            noe Competition), qui aura lieu à Montréal,        Team Batmoboggan from UBC makes their                                              pour avoir plus de renseignements. „
                            à l’École de technologie supérieure (ETS), du      way down the hill./Même les superhéros
                            17 au 19 mai prochain. Pour obtenir tous les       participent ! L’équipe « Batmoboggan »                                             Vous pouvez rejoindre Amie Therrien à
                            détails, consultez le site concretecanoe.com.      de UBC en pleine descente.                                                         l’adresse yp@csce.ca

                                                                 WE DO IT ALL
                                              CORROSION PROTECTION & SEALING SYSTEMS YOU CAN DEPEND ON

                                                                               Extend Structure Life,
                                                                               Reduce Maintenance & Repair Costs
                                                                               -#%"(&'% &' *#%$$*#%%#&(%&
                                                                               -#) #*%#("$$ ) )&,''"&&'
                                                                                                                                                                                               www.densona.com
                                                                                                                                                                                                              #$#"&#( Edmonton
                                                                               -#&#%!%"$ "$%#''#"
                                                                                                                                                                                                          Denso North America Inc.
                                                                               -%#%%$#%'&$ '$$ '#"&
                                                                                                                                                                                  90 Ironside Cres. Unit 12 Toronto, ON M1X 1M3
                                                                               !!%#""# & "'%"'#"                                                                     Tel: 416.291.3435 Fax: 416.291.0898

                            Canadian Civil Engineer | May 2013                                                                                                                                                                       9
Know-how: Past and Present Savoir-faire: Passé et présent - Canadian Society for Civil ...
HISTORIC CIVIL ENGINEERING SITES | LIEUX HISTORIQUES DE GÉNIE CIVIL

     Atwater
     Treatment Plant
The City of Montreal’s first water treatment plant is over a century old,                        Above left: water reservoir constructed
but thanks to many upgrades it still provides good quality water to a                            in 1911. Inset: filtration gallery.
population of 1.8 million.

T    he Atwater Treatment Plant in the City
     of Montreal has been recognized this
year as a Civil Engineering Historic Site by
                                                original engineering works are still in opera-
                                                tion and the plant continues to produce high
                                                quality drinking water for Montreal.
                                                                                                   Even before the construction of the plant,
                                                                                                 it was Thomas Coltrin Keefer (one of the
                                                                                                 founding members of the Canadian Society
the CSCE.                                                                                        of Civil Engineers, the predecessor of the
  The Atwater treatment plant combined          History of the plant                             modern CSCE), who in 1853 proposed the
with the Charles J. des Baillets plant repre-   Due to an outbreak of typhoid fever in 1910,     construction at the end of the aqueduct canal
sents 88% of the City of Montreal’s water       Montreal city council decided to build its       of a pumping station powered by two water
treatment capacity serving a population of      first water treatment plant. The Atwater         wheels driven by the current in the canal.
1.8 million. The Atwater plant is the work      plant, which was completed in 1918, pro-         From this point the water was to be pumped
of Mr. Charles J. des Baillets who was chief    vided an initial capacity of 200,000 m3/day      to a reservoir on Mount Royal and redistrib-
engineer of the City of Montreal Aqueduct       and has since been upgraded to a capacity of     uted by gravity to the city. This distribution
Commission between 1921 and 1941.               1.36 million m3/day, making it the largest       system concept is the one still in use, begin-
  Established at the beginning of the last      in Quebec. The plant was also the largest in     ning at the site of the existing Atwater plant.
century, the plant has undergone expansion      Canada until the construction of a new treat-      Construction of the Atwater plant began in
and modernization. However, several of its      ment plant in Vancouver.                         1911. Most of the additions have been related

 HISTORIC CIVIL ENGINEERING SITES
 Each year, the CSCE’s National History Committee selects sites or projects to be commemorated as national Historic Civil Engineering Sites.
 This year, the Atwater Water Treatment Plant in Montreal and the trestle at Cap-Rouge near Quebec City are being honored.

10                                                                                                         Mai 2013 | L’Ingénieur civil canadien
HISTORIC CIVIL ENGINEERING SITES | LIEUX HISTORIQUES DE GÉNIE CIVIL

to process equipment, pumping expansions
and electrical upgrades. All buildings that            MAJOR MILESTONES IN THE CONSTRUCTION
house pumping and filtration activities are            OF THE ATWATER PLANT:
classified as “Buildings of Exceptional Heri-          1911        Construction of the first part of the plant (now converted to a reservoir).
tage Value” by the City of Montreal and                            This first gallery remains intact and includes the structural level (see photo).
their restoration must meet strict criteria.           1918-1921 Construction of the first wing (north) of the central pumping station.
  In the late 1970s the Charles J. des Baillets        1927-1947 Successive additions of filter galleries 2, 3 and 4.
plant was added to meet growing demands.               1932        Construction of the south wing of the central pumping station.
                                                       1951        Addition of a new intake.
Current upgrades                                       1958-1967 Addition of filter galleries 5, 6 and 7.
Following regulatory changes, upgrades to
the processing chain were started in 2005 to                                                          In addition to the administrative staff, the
ensure compliance with the new standards.                                                             plant has an operating staff of 69 and an en-
The original process was limited to sand                                                              gineering team of 20 engineers, technicians
filtration and chlorination. Ozonation and                                                            and telecommunications specialists. „
UV disinfection have since been added. For
security purposes, disinfection with chlorine                                                         This article is adapted from a submission by the
gas will be replaced by sodium hypochlorite                                                           City of Montreal to CSCE. The nominating
generated on site. Parallel to these changes,                                                         committee members from the City of Montreal
upgrades are being made to pumping, me-                                                               are: Chantal Morissette, Babak Herischi, Yves
chanical, electrical and control systems, and       Pumping station interior.                         Bernier, André Marsan, Robert Millette, with
to the building envelope.                                                                             support from Michèle Prévost (NSERC), Dinu
  By the time the upgrades are complete in            The Atwater plant is a tribute to engineer-     Bumbaru (Heritage Montreal).
2015 the Atwater plant will exceed regulatory       ing works that were designed and built to
standards both in terms of quality and capac-       meet both the needs of their time and into              TThe Atwater Plant in its current and
ity. These improvements, worth $300 million,        the future. All work undertaken hereafter is            projected
                                                                                                            p         state is equipped with
will give the city a plant on the cutting edge of   with a view to ensuring sustainability.                 the
                                                                                                            t following:
technology at a cost below that of a new plant.       For almost a century the Atwater plant has            • Raw Water Pumps: 5 pumps of 225,000
  By opting for the renovation of this cen-         represented a fertile skills development venue            m3/day (500 hp); 5 pumps of 160,000 m3/
tury old plant, the city will meet the highest      for civil engineering. The current (2005-                 day (350 hp)
standards of water supply while optimizing          2015) major upgrading project has enabled               • 96 filters in 6 galleries with a capacity of
investments, ensuring sustainability and pre-       many to gain professional experience in the               576 m3/hr
serving a unique civil engineering site.            most recent innovations in water treatment.             • Ozonation (under construction). A filter
                                                                                                              gallery is being converted into a contact
                                                                                                              tank for pre-ozonation and for adding
                                                                                                              coagulation chemicals to about 210,000
                                                                                                              m3 of filtered water and almost 75,000
                                                                                                              m3 of water filtered and disinfected.
                                                                                                            • Addition of an ultraviolet disinfection
                                                                                                              system replacing the current chlorine
                                                                                                              gas system and addition of a system to
                                                                                                              produce sodium hypochlorite on site.
                                                                                                            • 14 high pressure pumps of 135,000 m3/
                                                                                                              day (2000 hp)
                                                     Pumping station today.                                 • 3 – 1800-mm diameter steel outlet
                                                     Inset: original pumping station.                         headers and 1 – 1500-mm diameter outlet.

Canadian Civil Engineer | May 2013                                                                                                                     11
HISTORIC CIVIL ENGINEERING SITES | LIEUX HISTORIQUES DE GÉNIE CIVIL

                                                                                                              Source: The Valentine and Sons
                                                                                                              Publishing Co Ltd, collection Magella
                                                                                                              Bureau, vers 1910 (carte postale)

                                                                                                              une force économique concurrentielle. Et en
                                                                                                              raison de ce lien avec le Tracel, ce gigan-

     Le Tracel                                                                                                tesque projet a aussi largement collaboré
                                                                                                              au développement du Nord de l’Ontario
                                                                                                              et du Québec -- dans ce dernier cas sur-

     de Cap-Rouge                                                                                             tout l’Abitibi et la Mauricie. C’était la belle
                                                                                                              époque d’importants chantiers ferroviaires.

                                                                                                              La chronologie de la construction du Tracel
                                                                                                              La Commission du chemin de fer National
Par Yolande Perron                                       Le Tracel de Cap-Rouge appartient à                  Transcontinental approuve le tracé général
(recherche et rédaction)                               cette génération de monumentales struc-                fin 1905 ou début 1906. Ce viaduc s’étendra
                                                       tures en acier : 4 288 000kg ont été                   sur 1017m de longueur et d’une hauteur de

C     ap-Rouge se situe à l’ouest de la ville
      de Québec sur le fleuve Saint-Laurent
à 2,5km du pont de Québec.
                                                       utilisé. La compagnie Dominion Bridge de
                                                       Lachine, Montréal, est le maître d’œuvre
                                                       des plans de la superstructure. Mandatée
                                                                                                              52,4m à marée basse.
                                                                                                                À l’été de 1906, les entrepreneurs M.P. et
                                                                                                              J.T. Davis commencent les travaux de fonda-
  Au début du XXe siècle, le patrimoine                par la Commission du chemin de fer Na-                 tions. Se joindront à eux d’autres ingénieurs
carougeois s’est enrichi d’une construction            tional Transcontinental, elle s’emploiera à            comme E.A. Hoare, pour une courte durée
monumentale en acier désignée dans le                  l’édification et au rivetage des structures            et de qui relèvent d’ailleurs les emprises du
langage populaire sous le nom de « Tracel              métalliques. Dans le paysage de Cap-Rouge,             pont de Québec, et surtout A.E. Doucet,
» de l’anglais trestle. Il a été construit pour        le Tracel est un témoin de l’architecture in-          ingénieur responsable du district B de la
franchir une vallée profonde, sans devoir la           dustrielle de son époque.                              Eastern Division.
contourner au nord par un long détour, et                                                                       Rapidement, on se rend compte que la
surtout respecter les normes prescrites des            La construction du pont de Québec,                     tâche sera plus ardue qu’envisagée. À Cap-
pentes et des virages.                                 indissociable du Tracel                                Rouge, les marées hautes peuvent atteindre
  Cette importante structure fait partie du            En 1906 on débutera la construction du viaduc          de 5 à 7m. Ainsi elles pourraient emporter les
troisième transcontinental qui relie le Cana-          ferroviaire pour rejoindre le pont de Québec           piliers ou une érosion pourrait avoir le même
da d’une côte à l’autre. Le Tracel, après 100          conçu et construit principalement pour ser-            résultat. Par conséquent, on décide d’adopter
ans de loyaux services, est toujours fonc-             vir de pont ferroviaire. Ce sont deux projets          la technique des caissons pneumatiques bien
tionnel. Aujourd’hui deux ou trois trains de           intimement liés, ils seront ainsi plus faciles à ré-   que cette technique soit plus coûteuse que le
marchandise le parcourent quotidiennement              aliser. Par le Tracel, on viendra traverser le pont    contrat le permet.
à vitesse réduite.                                     de Québec pour se rendre sur la rive sud du              Les premiers plans du viaduc comprennent
                                                       Saint-Laurent jusqu’au Nouveau-Brunswick.              32 chevalets. L’approbation de les modifier
La venue de la technologie de l’acier pour les         Les Maritimes sont importantes en raison de            a été confirmée le 19 mars 1907, dans une
ponts ferroviaires                                     leur accès direct à l’Atlantique par leurs ports       lettre adressée à la Commission du National
La fin du XIXe et le commencement du XXe               où affluent marchandises et immigrants.                Transcontinental Railway signée par M.
siècle marquent le début de la technologie de            En effet ce nouveau projet ferroviaire d’un          Hugh D. Lumsden, ingénieur en chef (Sgd).
l’acier pour les ponts ferroviaires dû à sa solidité   océan à l’autre a grandement contribué à               Pour éviter la construction de piliers en plein
et sa durabilité, nonobstant le coût plus élevé.       la croissance économique du Canada par                 dans la rivière, on a résolu d’enjamber la
L’ère de cette nouvelle technologie d’acier et de      l’exploitation des ressources naturelles,              rivière avec des piliers de formes différentes
fer succédait aux grosses structures en bois des       l’immigration, l’agriculture, les ressources           voisinant la rivière. Les piliers prévus d’avant
ponts ferroviaires qui déclinaient en vertu de         minières, le transport efficace des marchan-           sont remplacés par des piliers rectangulaires
nos rigoureux hivers canadiens.                        dises et des passagers, ce qui a fait du Canada        plus volumineux à cause de la profondeur des

12                                                                                                                      Mai 2013 | L’Ingénieur civil canadien
assises solides. Seul le tiers de la hauteur de ces piliers sont apparents.
Mais ce travail a toutefois impliqué 1735,6m3 de béton chacun et
de nombreuses heures additionnelles. D’ailleurs, la justification de
l’emploi de cette technique plus longue et par le fait même plus coû-
teuse fera l’objet d’une commission d’enquête.
  La construction des trois caissons pneumatiques et des fondations per-
dure bien que la livraison du viaduc soit prévue pour l’ouverture du pont
de Québec en 1909. Parallèlement la Dominion Bridge commence les
travaux de la superstructure en juin 1907 sur les piliers déjà en place, à
partir de l’extrémité sud-ouest de la vallée et se dirigeant vers le nord-est.
  Par ailleurs, à cause du premier effondrement du pont de Québec
en août 1907, il n’y a moins de hâte à compléter le viaduc. Les rails
seront posés entre 1908 et 1911 et les autres travaux nécessaires seront
graduellement échelonnés jusqu’en septembre 1913. Mis à part le
pont de Québec, la ligne Winnipeg-Moncton était complétée le 17
novembre 1913.
  Le viaduc de Cap-Rouge fut la première structure importante de
son genre à être réalisée au Canada. Toutefois en importance au Can-
ada il vient en second lieu après le viaduc de Lethbridge en Alberta.

Le rivetage à chaud
Le travail de rivetage à chaud était exécuté dans des conditions dan-
gereuses. Il demandait beaucoup d’adresse et de force. Comme l’acier
refroidissait rapidement il fallait se presser.
  Selon nos sources l’équipe de rivetage se compose de quatre hom-
mes. Henri Bertrand, porteur-d’eau, avait relaté à sa famille le
processus d’exécution pour la pose des rivets. À partir d’une forge
mobile, il y a celui qui lance les rivets chauffés à blanc, celui qui les
attrape au vol avec un cornet pour les passer avec de grandes pinces
d’acier à un troisième qui les met en place dans les trous préparés à cet
effet. Le dernier homme de l’équipe, à l’aide de son marteau à riveter,
écrase les deux extrémités du rivet chauffé à blanc. (Déry, 2000).

Le fonçage à air comprimé
Ces caissons de béton étaient coulés à l’intérieur d’un batardeau con-
struit en pièces de bois jusqu’à la nappe d’eau. A l’intérieur de ce
batardeau, un caisson était coulé et enfoncé au fur et à mesure que les
ouvriers, travaillant dans une pièce pressurisée sous le caisson, extir-
paient la glaise pour la placer dans une benne remontant le matériel
à la surface par un cylindre de 1,9m de diamètre. Il faudra creuser
profondément à travers la boue et la glaise pour atteindre le roc ce qui
aura comme fonction de bien asseoir les piliers.
  Les ouvriers ne pouvaient travailler que quelques heures consécu-
tives vu la pression constante qui empêchait l’eau d’entrer dans le
caisson. Un deuxième tube d’acier avec échelle et écoutille permettait
l’accès et la sortie des ouvriers le tout étanche à 35 livres au pouce
carré de pression (Simard, 1920; Ouellet, 1948).

Canadian Civil Engineer | May 2013                                               13
HISTORIC CIVIL ENGINEERING SITES | LIEUX HISTORIQUES DE GÉNIE CIVIL

                                                                                                 un coût total des fondations de 454 133,51$.
                                                    Source: collection Société historique        Quant à la superstructure, elle ne coûtera
                                                    du Cap-Rouge, vers 1908                      guère plus cher que le contrat ne le prévoyait,
                                                                                                 soit un grand total de 817 462, 73$.
                                                                                                   Selon l’évaluation foncière en vigueur pour
                                                                                                 les trois prochaines années d’exercice, la val-
                                                                                                 eur du terrain et du Tracel est de 8 425 000$,
                                                                                                 soit environ dix fois le coût d’origine.

La poutre à treillis                             porter une charge quatre fois plus lourde que   Conclusion
Une poutre à treillis, appelée également         prescrite par les normes (Nicole, 1983).        Le viaduc de Cap-Rouge reste un témoin d’une
poutre Eiffel ou poutre rivetée, est un en-                                                      époque de bâtisseurs de pays et de nouvelles
semble de barres en acier reliées entre elles    La main-d’œuvre                                 techniques. Le Tracel est de construction no-
en formant des triangles.                        À la construction du viaduc, le contremaître    table par ses dimensions. Il l’est aussi par la
  Très présente durant la période de la          du chantier, Jos Brousseau de Cap-Rouge, a      méthode à caisson pneumatique utilisée. Ce
construction du Tracel cette technique, com-     signalé qu’entre 1908 et 1909 il se trouvait    pont ferroviaire sur 30 chevalets est très im-
parativement à d’autres, a comme principal       sur le chantier jusqu’à 500 travailleurs qui    posant. Malgré cette masse métallique, la
avantage d’être un élément porteur plus ef-      venaient de Québec, Sainte-Foy, Cap-Rouge,      finesse de l’ensemble de son treillis est claire-
ficace, solide et rigide tout en permettant un   St-Augustin, etc. (Lessard, 2008).              ment perceptible sous différents angles. „
assemblage solide avec un minimum d’acier.
Conséquemment on obtient une structure           Les coûts
moins lourde.                                    Une commission royale d’enquête justifia        Références
  Cette particularité de poutre comprend         les coûts supplémentaires apportés au con-      Déry, Jean (2000), « Le viaduc de Cap-Rouge – 1906-
                                                                                                    1910 – phases de construction des piliers caissons », Le
généralement deux membrures parallèles           trat original, dans l’esprit du grand défi de
                                                                                                    St-Brieuc, vol. 9, p. 3.
reliées par un mélange de « diagonales » et de   stabiliser les piliers qui demandaient les      Lessard, Michel (Miard) (2008). Mon enfance Ca-
« montants » disposés à angle droit par rap-     fondations améliorées par des caissons pneu-       rougeoise, Tome 1, en collaboration avec la Société
port aux membrures. Construit selon cette        matiques. Les trois chevalets jouxtant la          historique du Cap-Rouge, 2ième trimestre, p.150.
technique, le Tracel est assez solide pour       rivière coûteront à eux seuls 329 429,18$ sur   Nicole, Jean-Marc, et Vallières, Marc (1983). Le viaduc
                                                                                                    de Cap-Rouge, La Société historique du Cap-Rouge,
                                                                                                    deuxième trimestre, 1983, p. 24. (Collection Cap-
                                                                                                    Rouge no. 5)
                                                                                                 Ouellet, Octave (1948), « Histoire vécue d’un Canadien
                                                                                                    errant », Hebdo Plage St-Laurent, vol. 4, no. 1, pp.
                                                                                                    325-328.
                                                                                                 Simard, Abbé Henri (1920), Propos scientifiques, Québec,
                                                                                                    Imprimerie de l’Action sociale, p. 20-22.

                                                                                                 L’auteure remercie messieurs Mario Fafard et Cal Sex-
                                                                                                 smith pour leur encouragement lors de la préparation du
                                                                                                 dossier à l’ intention de la Société canadienne de Génie
                                                                                                 civil. L’auteure remercie monsieur Yvon Lirette pour son
                                                                                                 support technique et la Société historique du Cap-Rouge
                                                                                                 (SHCR) pour son appui. Il est à noter que les célébrations
                                                                                                 du Centenaire du Tracel de Cap-Rouge constituent un
                                                                                                 projet de la SHCR, www.shcr.qc.ca. Parmi les activités
                                                                                                 figurent le dévoilement de la plaque de reconnaissance qui
                                                                                                 se tiendra à l’automne 2013; un concours à l’ intention des
                                                                                                 étudiants en Génie civil de l’Université Laval sur « la mo-
                                                                                                 délisation du Tracel » à l’aide du logiciel SAFI; un autre
                                                                                                 concours à l’ intention des étudiants à l’École d’architecture
                                                                                                 de l’Université Laval sur « l’Avenir du Tracel » concours
                                                                                                 la charrette.

14                                                                                                           Mai 2013 | L’Ingénieur civil canadien
THANK YOU TO OUR
CORPORATE SPONSORS!
UN GRAND MERCI À NOS
COMMANDITAIRES !
CONFERENCE ORGANIZATION
The Annual General Conference is being held
in conjunction with four specialty conferences
                                                    ̒   Emergency-preparedness planning and post-        ̒   Soil reinforcement
                                                        disaster management
and a forum on professional practice and career                                                          ̒   Improvement of loadbearing capacity
development. The conference theme                   ̒   GIS in emergency management
                                                                                                         ̒   Underpinning and foundation repairs
of Know-How will be covered throughout.             ̒   Disaster response for lifeline systems
                                                                                                         ̒   Properties of structural and geotechnical
The Annual General Conference provides              ̒   Rapid damage assessment                              materials
researchers and practitioners with a wide variety
of topics including:
                                                    ̒   Vulnerability assessment at local and urban
                                                        scales
                                                                                                         2ND FORUM ON PROFESSIONAL
̒    geotechnical engineering                       ̒   Seismic retrofit and advanced technologies        PRACTICE AND CAREER
̒    structural engineering                         ̒   Advances in monitoring technologies and alert    DEVELOPMENT:
                                                        systems
̒    environmental engineering                                                                           EMPLOYMENT OF CIVIL ENGINEERS IN THE 21ST
̒    transportation engineering and policy making
                                                    ̒   And public participation in emergency
                                                                                                         CENTURY
                                                        response.
̒    sustainable development and practices                                                               ̒   Canadian Engineering Competiveness in
̒    case studies                                   4TH CONSTRUCTION SPECIALTY
                                                                                                             Foreign Markets

̒    civil engineering history                      CONFERENCE:                                          ̒   Outsourcing and foreign competition

̒                                                                                                        ̒   Employment, unemployment, and
     codes of practice and their change to
     encourage greater sustainability
                                                    ̒   Construction engineering and management              underemployment

̒© cold and arctic regions engineering              ̒   Modeling and simulation                          ̒   Recruitment and retention of engineers, their

̒ emerging technologies                             ̒   Planning and scheduling
                                                                                                             remuneration and unionization

                                                    ̒   Management and optimization of construction      ̒   Difficulty in establishing new engineering
̒ geomatics and remote sensing                          operations and processes: procurement,
                                                                                                             enterprises
̒ municipal engineering                                 Resources, quality assurance, health and
                                                        safety and risk assessment
                                                                                                         ̒   Supply and demand of engineering graduates
̒ information technologies & computer                                                                    ̒   Erosion of the scope of civil engineering
     applications                                   ̒   Integrated cost and time control                     practice
                                                    ̒   Productivity and benchmarking
                                                                                                         EDUCATION AND CONTINUING EDUCATION
4 SPECIALTY CONFERENCE ON
    TH                                              ̒   Sustainable infrastructure management
COASTAL, ESTUARY AND OFFSHORE                       ̒   Computer and web-based applications
                                                                                                         ̒   Teaching future civil engineers

ENGINEERING:                                        ̒   Automated and realtime systems
                                                                                                         ̒   Perspectives on professional development

̒© Storms and hurricane: impacts and mitigation     ̒   building information modeling (BIM)
                                                                                                         ̒   Pedagogical challenges in technical upgrading
                                                                                                             and advancement of civil engineers
̒ Tidal inlet: morphodynamics and modeling          ̒   Decision-making system                           ̒   Recognizing emerging technologies
̒ Tsunamis: risk and mitigation                     ̒   Artificial intelligence and information
                                                        technology                                       CIVIL ENGINEERS IN THE WORKPLACE
̒ Structures côtières : modélisation physique et
     numérique                                                                                           ̒   Ethics, liability and insurance in a changing
̒    Coastal structures: physical andnumerical      3RD SPECIALTY CONFERENCE ON                              world
     modeling wave and tidal energy                 ENGINEERING MECHANICS AND                            ̒   Professional image and career advancement
̒    Ports andnavigation waterways: design and      MATERIALS:                                           ̒   Challenges of working in multidisciplinary,
     retrofitting                                                                                             diverse workplaces
̒                                                   ̒   Novel experimental and numerical methods
     The Great Lakes: challenges and problems                                                            ̒   Professional licensing and learned societies:
̒    Impacts of global warming on coastal
                                                    ̒   Nonlinear behavior and structural stability          allies or competitors?
     structure design and coastal erosion.          ̒   Computer-aided engineering; probabilistic
                                                                                                         CIVIL ENGINEERS IN THE WORLD
                                                        methods

3RD SPECIALTY CONFERENCE
                                                    ̒   High-performance and innovative materials        ̒   International development

ON DISASTER PREVENTION AND                          ̒   Aging effects and long-term durability of        ̒   Disaster relief
                                                        materials
MITIGATION:                                                                                              ̒   Third world issues in engineering practice
                                                    ̒   Elasticity, plasticity, and fracture mechanics       (corruption, receiving payment, building
̒    Wind storms
                                                    ̒   Application of recycled materials in road and
                                                                                                             effective partnerships)
̒    Winter storms: snow and atmospheric icing          construction industry
̒    Earthquakes                                    ̒   Bituminous and pavement materials
                                                    ̒   Soil-structure and fluid-structure interactions

16                                                                                                                   Mai 2013 | L’Ingénieur civil canadien
ORGANISATION DU CONGRÈS
La conférence générale se tiendra conjointement
avec quatre conférences spécialisées et un
                                                       ̒   Systèmes SIG en gestion de désastres               ̒   Renforcement des sols
forum sur la pratique professionnelle et le            ̒   Réponse des infrastructures essentielles           ̒   Amélioration de la capacité portante
développement de carrière.
                                                       ̒   Évaluation rapide des dommages                     ̒   Reprise en sous-œuvre et réparation des
                                                                                                                  fondations
Le thème du congrès « Savoir-faire » se veut           ̒   Évaluation des vulnérabilités à l’échelle locale
rassembleur, il propose aux chercheurs et aux              et à l’échelle urbaine                             ̒   Propriétés des matériaux structurels et
                                                                                                                  géotechniques
ingénieurs praticiens une grande variété de
sujets incluant :
                                                       ̒   Technologies de surveillance et systèmes
                                                           d’alerte
̒    ingénierie géotechnique                           ̒   Participation des citoyens dans la réponse         2E FORUM SUR LA PRATIQUE
̒    ingénierie des structures
                                                           post-désastre                                      PROFESSIONNELLE ET LE
                                                                                                              DÉVELOPPEMENT DE CARRIÈRE:
̒    ingénierie de l’environnement
                                                       4E CONFÉRENCE SPÉCIALISÉE SUR LA
̒    ingénierie des transports, et l’élaboration des
                                                       CONSTRUCTION:
                                                                                                              EMPLOIS POUR LES INGÉNIEURS CIVILS AU 21E
     politiques                                                                                                 SIÈCLE
̒    développement durable et les pratiques            ̒   Gestion de l’ingénierie et de la construction      ̒   Compétitivité du génie canadien dans les
                                                                                                                  marchés étrangers
̒    études de cas                                     ̒   Modélisation et simulation
                                                                                                              ̒   L’externalisation et la concurrence étrangère
̒    l’histoire du génie civil                         ̒   Planification et ordonnancement
                                                                                                              ̒   L’emploi, le chômage, et la sous-utilisation des
̒    les codes de pratique et leur changement afin      ̒   Gestion et optimisation des opérations                 capacités
     d’encourager une plus grande durabilité               de construction et des processus :
                                                                                                              ̒   Le recrutement et la rétention des ingénieurs,
̒    le génie des régions froides et arctiques
                                                           approvisionnement, ressources, assurance
                                                           qualité, santé et sécurité et risques                  leurs rémunérations et la syndicalisation
̒    les technologies émergentes
                                                       ̒   Contrôle intégré des coûts et du temps             ̒   Difficulté à établir de nouvelles entreprises
̒    géomatique et la télédétection
                                                       ̒   Productivité et analyse comparative
                                                                                                                  d’ingénierie

̒                                                                                                             ̒   Offre et demande de diplômés en génie
     génie municipal
                                                       ̒   Gestion durable des infrastructures
                                                                                                              ̒   L’érosion de la portée de la pratique du génie
                                                       ̒   Applications informatiques et Web                      civil
4E CONFÉRENCE SPÉCIALISÉE SUR                          ̒   Systèmes automatisés en temps réel                 EDUCATION ET FORMATION CONTINUE
L’INGÉNIERIE CÔTIÈRE ET EN MILIEU
MARITIME:                                              ̒   Modélisation des informations du bâtiment          ̒   Enseigner aux futurs ingénieurs civils
                                                           (BIM)
                                                                                                              ̒   Perspectives sur le développement
̒    Tempêtes et ouragans : impacts et mesures         ̒   Systèmes d’aide à la décision                          professionnel
     d’atténuation
                                                       ̒   Intelligence artificielle et technologie de         ̒   Les défis pédagogiques dans les mises à
̒    Goulet de marée : morphodynamique et                  l’information                                          niveau techniques et dans l’avancement des
     modélisation                                                                                                 ingénieurs civils
̒    Tsunamis : risques et atténuation
                                                       3E CONFÉRENCE SPÉCIALISÉE SUR                          ̒   Reconnaître les technologies émergentes
̒    Structures côtières : modélisation physique et    LA MÉCANIQUE APPLIQUÉE ET LES                          INGÉNIEURS CIVILS DANS LE MILIEU DE TRAVAIL
     numérique
                                                       MATÉRIAUX:                                             ̒   L’éthique, responsabilité et assurance dans un
̒    Énergie des vagues et des marées                                                                             monde en mutation
̒                                                      ̒   Nouvelles méthodes expérimentales et
     Ports et voies navigables : conception et             numériques                                         ̒   L’image professionnelle et l’avancement
     rénovation                                                                                                   professionnel
                                                       ̒   Comportement non-linéaire et stabilité des
̒    Les Grands lacs : les défis et les problèmes           structures                                         ̒   Les défis de travailler dans les lieux de travail
                                                                                                                  multidisciplinaires
̒    Impacts du réchauffement climatique sur la        ̒   Ingénierie assistée par ordinateur
     conception de structures côtières et l’érosion                                                           ̒   Les professionnels des sociétés d’octroi de
     côtière                                           ̒   Méthodes probabilistes                                 licences et brevets: des alliés ou concurrents?
                                                       ̒   Matériaux novateurs et de haute performance
                                                                                                              INGÉNIEURS CIVILS DANS LE MONDE
3 CONFÉRENCE SPÉCIALISÉE SUR LA
 E                                                     ̒   Effets du vieillissement et durabilité à long
PRÉVENTION ET LA MITIGATION DES                            terme des matériaux                                ̒   Développement à l’international
DÉSASTRES NATURELS:                                    ̒   Élasticité, plasticité, et mécanique de la         ̒   Les opérations de secours
                                                           rupture
̒                                                                                                             ̒   Les questions du Tiers-Monde dans la
     Vents extrêmes                                    ̒   Application des matériaux recyclés dans                pratique du génie (la corruption, la réception
̒    Tempêtes hivernales: neige et verglas                 l’industrie de la construction et des routes           du paiement, l’établissement de partenariats

̒    Séismes                                           ̒   Matériaux bitumineux et enrobés de                     efficaces)
                                                           chaussées
̒    Gestion des désastres et planification des
                                                       ̒   Interactions sol-structure et fluide-structure
     mesures d’urgence

Canadian Civil Engineer | Mai 2013                                                                                                                               17
SOCIAL EVENING                                                        SOIRÉE SOCIALE
Montreal’s 2013 social evening event will be like none other!         La soirée mondaine du congrès 2013 sera tout un événement.
This year’s theme is “Moulin Rouge/Cabaret”. This will be a           Cette soirée aura pour thème « Cabaret/Moulin Rouge ». Et ce
fun filled exciting night indeed. Walking distance from the            sera toute une soirée, qui commencera par une petite marche
Centre Sheraton, the first part of your evening will be a typical      depuis le Centre Sheraton jusqu’à la rue Crescent, haut lieu
Montreal happening on Crescent St. In Montreal’s famous Sir           des soirées montréalaises. Au « Sir Winston Churchill pub »,
Winston Churchill pub, you will experience a true Montreal            vous apprécierez le traditionnel cinq à sept montréalais. Belle
cocktail hour. A Cinq à Sept in the speak of the town. Drinks (2)     occasion pour revoir de vieux amis de la SCGC !
and appetizers will welcome you. Reconnect with old CSCE
friends and make new ones at this landmark Montreal watering          Après l’apéro, vous monterez au Club Karina, au « Cabaret/
hole.                                                                 Moulin Rouge » ! Une soirée pleine de surprises, avec un
                                                                      spectacle qui vous en mettra plein la vue ! Sans parler du repas
Later we will all make our way upstairs to Karina’s Club Lounge.      de quatre services bien arrosé. Une soirée à ne pas rater !
You will be welcomed to our “Moulin Rouge/Cabaret”! This night
promises to be one of excitement and surprises. A feast for your      Tenue vestimentaire : selon votre bon goût. Tenue relax ou plus
sight, taste and all your senses! You will enjoy a 4 course meal      élaborée, selon vos préférences.
which also includes 2 glasses of wine. This tantellizing evening
is one you won’t want to miss!

Dress: Any way you feel good. Dress down or up to the nines. It’s
“MOULIN ROUGE” and Montreal after all. A little naughty, a little
nice, it’s all up to you.

COMPANION’S PROGRAM                                                   PROGRAMME ACCOMPAGNATEURS
We are very proud to present our Companion’s Program for the          Nous sommes fiers de vous présenter notre programme
Montreal 2013 Conference!                                             des compagnes et compagnons pour le congrès de 2013 à
                                                                      Montréal ! Nous avons organisé trois journées absolument
We have put together 3 exciting days of Montreal touring.             fascinantes de visites à Montréal. Kate Puxley, une jeune artiste
Accompanying you for the entire 3 days will be Kate Puxley, a         du Québec, vous accompagnera en tout temps, pendant ces
young , talented Quebec artist who will be there with you every       trois jours, pour vous faire découvrir notre belle ville.
step of the way to show you our beautiful and exciting city.
                                                                      Pour plus de renseignements sur le programme, cliquez sur
For more information on the Program, please click on the links        les liens ci-dessous. Vous n’êtes pas tenu de participer aux
below. You are not required to attend all three days of activities,   activités tous les jours. Toutefois, si vous participez à tous les
however as a special gift to you, if you attend all three days, you   jours, vous serez invité à un cocktail spécial dans la suite du
will be invited to a very special cocktail in the President’s suite   président, pendant lequel vous aurez droit à une séance de
where you will be pampered by having your hair and makeup             coiffure et de maquillage qui vous permettra de vous présenter
done just for you so you will look your very best at the Awards       en beauté au banquet des lauréats !
Banquet!
                                                                      ̒   Cuisine/Opéra et visite à pied du Vieux Montréal
Please know that we’ve worked very hard to ensure you have the
very best prices possible and are at cost to the Montreal 2013        ̒   Stade olympique – Biodôme – Jardin botanique
Conference.
                                                                      ̒   Visite de magasinage – Holt Renfrew, Ogilvy
̒    Cuisine/Opera and Old Montreal Walking Tour                          et la rue Ste-Catherine

̒    Olympic Stadium-Biodome-Botanical Gardens

̒    Shopping tour – Holt Renfrew, Ogilvy
     and Ste. Catherine Street

18                                                                                                    Mai 2013 | L’Ingénieur civil canadien
Vous pouvez aussi lire