Les infrastructures en Indonésie - Sébastien VICENTE Chargé du secteur Industrie et Cleantech - AFTES

La page est créée Elisabeth Paris
 
CONTINUER À LIRE
Les infrastructures en Indonésie
          Sébastien VICENTE
 Chargé du secteur Industrie et Cleantech
L'Indonésie, c'est……

                                                        Brunei                                                      Pacific Ocean
                  South China Sea
                                                                                                                                                     N
                                                                                                                    Time
                                                                                                                    Zone                     W               E
        Sumatera                                      Kalimantan
                                                                                                                                                     S

                                                                                Sulawesi
               West Indonesia                                 Central Indonesia                                      East Indonesia          Irian

Equator                         Jakarta

                                              Java

               Indian Ocean
                                                                 Bali   4ème plus grande population du Monde:
                                                                        Plus de 250 millions d'habitants (+ 1,13% p.a). L'âge médian est de 27,6 ans
                                                                        • 52% de la population vit dans les centres urbains, le taux d'urbanisation est de
Plus grand archipel du monde                                              3,3% (de 2005 à 2014)
• 17 508 îles avec 6 000 habitées                                       • Répartition de la population : 63% à Java, 21% à Sumatera, 6% à Sulawesi, 7% à
• Divisé par l’Equateur                                                   Kalimantan
• 3 100 miles de large (large comme les État –Unis , 8 x de
                                                                        • 95% sont natifs d’Indonésie, 5% sont de familles d’origine chinoise ou indienne
  Royaume –Uni )
• 3 fuseaux horaires - Ouest, Centre, Est (1 heure de                     etc.)
  différence)                                                           • 86% sont mulsumans, 5,7% protestants, 3% catholiques, 2% hindu, 2% bouddhiste
                                                                        • 37 groupes ethniques , 300 dialectes
                                                                        • Le Bahasa Indonesia est la langue officielle
2
L’Indonésie aujourd’hui …
                        et dans 30 ans

        16ème plus grande                    7ème plus grande
        économie dans le monde               économie dans le monde
        (membre du G20)

             55 millions                         113 millions
             de travailleurs qualifiées          de travailleurs qualifiées
             sur le marché indonésien            sur le marché indonésien

45 millions de personnes                  135 millions de personnes
font partie de la classe moyenne          feront partie de la classe moyenne

             53% de la                              71% de la
             population en ville                    population en ville
             génère    74% du PIB                   génèrera   86% du PIB

Source : McKinsey Global Institue
Carte d’identité de l’archipel
                                       Indonésie

        Capitale              Jakarta (28 millions d’habitants)

        Superficie            1 919 440 km² & 17 508 Iles (x 4 la France)

        Population            250 M hab (4e pays au monde)

                              République démocratique
        Régime

        Croissance            5,4%

        Ligne Côtière         ± 95 000 km

        Monnaie               Roupie Indonésienne (IDR)

        PIB (2013)            847 Mds USD

        PIB/habitant (2013)   3495 USD/an

                              Industrie manufacturière: 25,6 %
                              Commerce et Tourisme: 17,8%
                              Agriculture : 13,3 %,
        Répartition du PIB
                              Transport et communication: 10,1%
                              Finance: 9,5 %
                              Extraction minière : 7,1%
        Taux de chômage       6,14 % en 2014
        Taux d’inflation      2012 : 4,3%
Une superpuissance émergente :
                  de nombreux défis à relever
    •   L’Indonésie a l’ambition de devenir la plus
        grande puissance économique du Sud-Est
        Asiatique

    •   Les défis du gouvernement Indonésien :
         - Un manque d’infrastructure (route,
            autoroute, transports en communs,
            hôpitaux, écoles)
         - Embouteillages et pollution
         - Catastrophes naturelles (inondations,
            tremblement de terre, tsunami, éruption
            volcanique)
         - Capitale surpeuplée (carence en
            logement, traitements des déchets
            insuffisant)

    •   Jakarta, capitale de l’Indonésie :
          - Situé sur l’île de Java
          - Une mégalopole de + 17M d’habitants
          - Superficie de la ville : 740,3 km²
          - Densité : 13 344 hab./km²

5
Un nouveau Président attendu au tournant

                         • Joko Widodo, dit « Jokowi »

                         • 53 ans

                         • Artisan, puis maire de Solo, avant de devenir
                           gouverneur de Jakarta et, désormais,
                           Président

                         • Investi le 20 octobre dernier

                         • Ses 100 premiers jours:
                          Forte réduction des subventions au carburant
                           afin de financer le plan de développement
                           économique
                          Création d’un guichet unique pour les
                           investisseurs
                          Package de régulations pour faire face au
                           déficit courant
7
Le fameux MRT de Jakarta

                     Rail-based MRT Jakarta will stretch over ±110.8 km Jakarta roads,
                     consists of South-North Corridor (Lebak Bulus – Kampung Bandan) of
                     about 23,8 km and East-West Corridor of about 87 km.

                     • The construction of South-North Corridor that stretches along Lebak
                     Bulus – Kampung Bandan will be carried out in 2 stages:

                     - Stage I will be carried out to connect Lebak Bulus with Bundaran HI
                       over 15.7 km railway with 13 stations (7 elevated stations and 6
                       underground stations) which is targeted to operate by 2018.

                     - Stage II will expand South-North Corridor from Bundaran HI to
                       Kampung Bandan over 8.1 km railway, which construction will have
                       been initiated before Stage I operates and is targeted to be
                       completed on 2020. Feasibility study for this stage has been
                       completed.

                     • A feasibility study is on progress for East-West Corridor, which is
                     targeted to operate at the latest on 2024-2027.

8
MRT Jakarta

    - PT. MRT Jakarta was incorporated in June 17, 2008, after the approval of DKI Jakarta Local
      Legislative Parliament through Local Act No 3/2008 about Local Government Shares in the
      Establishment of PT. MRT Jakarta.

    - As a company, the category of business of PT. MRT Jakarta is in land transportation, with the
      main activities of business is city public rail transportation services, which includes
      development, operations, maintenance, and business from the MRT infrastructure and facilities,
      including area around MRT Depot and Stations.

    - PT. MRT Jakarta shareholders composition is,
    • Provincial Government of DKI Jakarta 99.5%
    • PD Pasar Jaya 0.5% (PD Pasar Jaya is Regional Owned Government Company which
      managed all the public market in Jakarta)

    - PT. MRT Jakarta will be responsible to all activities starting from the Engineering Service,
      Construction through Operations dan Maintenance.

9
Contractor Information of MRT Project

10
Opportunités dans le secteur ferroviaire
Etat des lieux:
                   Les tunnels ferroviaires en Indonésie (les +longs)

     1.   Sasaksaat tunnel  949 m
     2.   Sawahlunto tunnel  827 m
     3.   Eka Bakti Karya tunnel  760 m
     4.   Mrawan tunnel  690 m
     5.   Lampegan tunnel  687 m
     6.   Kupitan tunnel  600 m
     7.   Ijo tunnel  580 m
     8.   Tebing Tinggi tunnel  424 m
     9.   Gunung Gajah tunnel  368 m

12
Le transport ferroviaire de l’Indonésie aujourd’hui, c’est…

                       Chemin de fer
                        compte 4813                251 millions de
                       km de lignes,               passagers et 30
                                                     millions de
                       soit : 3327 km             tonnes de fret ont
                         sur Java et               été transportés
                        1348 km sur                    en 2014
                          Sumatra

                                                                       Chiffre
        Un programme                                                 d’affaires à
     important de projets                                           701,2 millions
        ferroviaires en                    Taux de                    USD (1er
      Partenariat Public                  croissance               semestre 2014)
     Privé (PPP), estimé à              actuelle +23%
     22,62 Mds USD entre
                                           Volume
         2015 et 2019
                                        d’importation
                                          77,8 % /an

13
…..mais demain, voici la solution

14
Le réseau ferroviaire en 2030

     Réseau ferroviaire        Actuellement   En 2030
     Sumatra                    1,352 Km      2,856 Km
     Java                       3,464 km      6,324 Km
     Bali                                     326 Km
     Kalimantan                               1,400 Km
     Sulawesi                                 500 Km

15   Papua                                    500 Km
Les projets ferroviaires               Kalimantan                       Sulawesi
                & urbains                     • Intercity railways network:    • Intercity railway network:
                                                Banjarmasin-Balikpapan-          Gorontalo, Manado, Bitung,
                                                Samarinda-….                     Pare-pare, Makasar, …
                                              • Pit to Port railways:          • Regional railway network:
                                                Samarinda, Balikpapan and        Maminasata
                                                Banjarmasin                    • Urban railway network:
               Sumatra                        • Coal Railways                    Makasar and Manado
• Intercity railway network: Aceh,                                             • Hasanudin airport railway
  Medan, Pekanbaru, Padang, …                                                  • Seaport access: Bitung
• Urban railway network: Medan,                                                  and Makasar
  Pekanbaru, Batam, Padang,
  Palembang, …
• Airport access : Kualanamu
• Seaport access: Tanjung Api-
  api
                                                       60 Mds USD sont
                                                          nécessaires

                     Java
     • Double tracking: North Java line
     • Electrification of urban rail                                                   Papouasie
     • High speed train from Jakarta to                                       • Intercity railways network:
       Surabaya                                                                 Sorong, Manokwari, Nabire,
                                                             Bali               Timika, Sarmi and Jayapura;
     • Urban railways network:
                                              • Regional rail network:
       Jabodetabek, Bandung, Yogyakarta,                                      • Pit to port railways:
                                                connecting central economic
       Semarang, Surabaya and other cities;                                     Manokwari and Jayapura
                                                activity and tourism area
     • Seaport accces: Tanjung Priok,                                           seaports;
                                              • Urban railway network:
       Cirebon, Tanjung Perak, …
                                                Denpasar
     • Airport access: Soekarno-Hatta,
                                              • Airport access
       Kertajati, Juanda, …
16
Décideurs
                                     Principaux acteurs     Ministère des Transports,
                                     institutionnels :      DG Rail, PT KAI, BAPPENAS
                                     Principaux acteurs
                                     privés
                                                            PT INKA

                                     Principaux clients     PT KAI – DG RAIL

     Ministère des Travaux Publics

17
Quelques projets
Development of South Sumatera Monorail

                                                   Location      Palembang, South Sumatera

                                                   Estimated     US$ 550,00 million
                                                    Project
                                                      Cost

                                                     Project     • The monorail is divided into four corridors
                                                   Description
                                                                 • The monorail is expected to generate 140,000
                                                                   trips/day in 2018
                                                                 •   Accomodate minimum 600 passaengers
                                                                 •    The average velocity is 45 km/h, with maximum
Project Background                                                   velocity 75 km/h with a waiting period in station
Palembang is the 9th biggest city in Indonesia                       of 1.5 minutes
with around 2 million population and 4,000
people per km2 in 2014. Palembang municipal                      •   OBC Preparation
aims to increase economic growth through            Status
regional network development. The network
should have integrated transportation system to
support the existing transportation in the area.
Through the development of monorails, the
Palembang municipal expects to be able to
anticipate the people movement within the area
of Palembang

19                                                                                                                   19
Manado-Bitung Toll Road

                                                   Location
                                                                 North Sulawesi

                                                   Estimated     US$ 353,00 million
                                                    Project
                                                      Cost

                                                     Project     This project consists of two parts :
                                                   Description
                                                                 • Section 1 : Manado Ring Road – Airmadidi with
                                                                   length 13.5 km
                                                                 • Section 2 :Airmadidi – Girian with length 25.5 km
                                                                 • The Social Cost Benefit Analysis result shows
                                                                   the project has EIRR of 26.86%
Project Background
The government plans to develop area within
Manado and Bitung as metropolitan area. The                      Land Acquisition process
                                                    Status
area will become the strategic area for trading
in North Sulawesi Province. It is the north gate
of Indonesia that directly facing East Asia and
Pacific Region.

20
                                                                                                                   20
Tanjung
                              Manado-Bitung
                                    Priok Access
                                              TollToll
                                                   RoadRoad

                                                                   DKI Jakarta
                                                     Location

                                                     Estimated     US$ 612,50 million
                                                      Project
                                                        Cost
                                                                   • this project is divided into five construction
                                                       Project       sections
                                                     Description
                                                                    Section 1                  3.40 km
                                                                    Section E-2                2.74 km
                                                                    Section E-2A               1.92 km
                                                                    Section NS link            2.24 km
                                                                    Section NS Direct Ramp     1.10 km
Project Background
Rapid expansion of social and economic           •     The Social Cost Benefit Analysis result shows the project
activities stimulates traffic density in DKI           has EIRR of 38.1%
Jakarta. Jakarta Outer Ring Road (JORR) is
planned to develop the peripheral area of DKI
Jakarta. Tanjung Priok Access Road is planned                      • Section E1 has been operated
to connect JORR to Tanjung Priok International         Status
                                                                   • Another sections : on process of land
Port. Tanjung Priok Access Toll Road project                         acquisition and construction
has an essential role for economic and
                                                                   • PPP scheme for operation and maintenance
industrial activities in central district of
Indonesia.

21                                                                                                                    21
Balikpapan-Samarinda
                            Tanjung
                                Manado-Bitung
                                    Priok Access   Toll
                                              TollToll
                                                   Road Road
                                                       Road

                                                          Location    East Kalimantan

                                                      Estimated
                                                                     US$ 1.200,00 million
                                                       Project
                                                         Cost
                                                        Project        Length           99.40 km
                                                      Description
                                                                       Design speed     80 km/hr
                                                                       Number of lane   2x2 lanes
                                                                       Lane of width    3.6 m

                                                      •      The Social Cost Benefit Analysis result shows the project
                                                             has EIRR of 19.9 %

                                                                      • Land acquisition process has reached 83%
Project Background                                        Status
Balikpapan Municipal and Samarinda Municipal
are two major cities in Kalimantan Island. The
improvement of economic and social activity
within the two cities has increased the mobility of
people and goods. This project will develop new
toll road to support the free movement of people
and goods across border, in order to increase
trade and tourism.

22                                                                                                                       22
Kayu Agung-Palembang-Betung Toll Road

                                              Location       South Sumatera

                                              Estimated      US$ 836,15 million
                                               Project
                                                 Cost

                                                Project        Length             111.69 km
                                              Description      Road Width/lane    3.60 m
                                                               Outer shoulder     3.00 m
                                                               Inner shoulder     1.50 m
                                                               Median             5.50 m
Project Background                            •     The Social Cost Benefit Analysis result shows the project
Transportation system in Sumatera shows             has EIRR of 28.96 %
inbalance of supply and demand. Kayu Agung-
Palembang-Betung Toll Road is an access                      • Unsolicited project
                                                  Status
road toward Eastern Highway and Middle                       • AMDAL has been completed in 2011
Highway of Trans Sumatera which is quite                     • DED document preparation
congested.
                                                             • Land acquisition for section I has been acquired

23
Cileunyi-Sumedang-Dawuan Toll Road

                                                                    West Java
                                                       Location

                                                      Estimated     US$ 1.015,80 million
                                                       Project
                                                         Cost
                                                                        Length                 60.28 km
                                                        Project
                                                      Description       Design Speed           80 km/hr
                                                                        Number of lane         2x2 lanes (start)
                                                                                               2x3 lanes ( end)
                                                                        Lane of width          3.6 m
                                                                        Outer shoulder width   3.0 m
                                                                        Inner shoulder width   1.5 m
Project Background
                                                      •    The Social Cost Benefit Analysis result shows the project
The Cileunyi-Sumedang-Dawuan Toll Road                     has EIRR of 23.32 %
project will provide direct access for transporting
agricultural and manufacturing goods. Thus ,                        • Land acquisition process
                                                          Status
this project will support the economic growth                       • Fase I : construction process using China Loan
and social development of West Java and                               (US$ 100 million)
surrounding areas.                                                  •   Fase II will be financed by China loan (US$ 235
                                                                        million)
                                                                    • Tender preparation (PPP portion)
                                                                    • Construction process as the government support.

24
                                                                                                                       24
Pandaan-Malang Toll Road

                                                                   East Java
                                                     Location

                                                     Estimated     US$ 420,00 million
                                                      Project
                                                        Cost
                                                                    Length                 37.62 km
                                                   Project
                                                 Description        Design Speed           80-120 km/hr
                                                                    Number of lane         2x2 lanes (start)
                                                                                           2x3 lanes (end)
                                                                    Lane of width          3.60 m
                                                                    Outer shoulder width   3.00 m
                                                                    Inner shoulder width   1.50 m
Project Background
                                                 •      The Social Cost Benefit Analysis result shows the project
Pandaan-Malang road is part of Southern Java            has EIRR of 20.14 %
road network. High frequency of pedestrian and
public vehicles in toll road creates road
congestions. The road congestion is inevitable                    • Land acquisition process
                                                     Status
for economy of the region, therefore the                          • DED document preparation
Pandaan-Malang toll road is designed to
improve the connectivity within the region                        • Pre-FS has been completed but still needs
                                                                    improvement

25
                                                                                                                    25
Environnement des affaires et
       clés du succès
Faire des affaires en Indonésie

     Les Indonésiens n’ont pas de nom de famille
     Importance des titres (Pak, Ibu, Sri etc.)
     Ne pas fixer vos interlocuteurs dans les yeux
     Les Indonésiens fonctionnent beaucoup à l’affectif. (sourire)
     Confirmer ses rdv d’affaires le jour même
     La ponctualité n’étant pas une règle d’or en Indonésie, il est
      inutile de s’impatienter
     Utilisation de la main droite UNIQUEMENT
     Garder son calme en toute occasion et veiller aux risques de
      « perte de face »
     S’appuyer sur un partenaire de confiance, sans toutefois
      s’abstenir d’autres conseils
     Le Networking est indispensable.
     Implantation indispensable pour approcher le secteur public.
Nos recommandations

 Soyez vigilant dans le choix de votre représentant ou distributeur
  local.
 Adaptez votre modèle d’entreprise au marché
 Faites-vous un nom
 Protégez votre propriété intellectuelle… du mieux que vous pouvez
 N’oubliez pas de tenir compte des droits à l’importation
 …et respectez les normes en matière d’importations
 Créer la relation est essentiel
 Résolvez efficacement toute discussion relative au règlement.
 Ne perdez pas un client important à cause d’un seul paiement en
  retard
 Soyez compétitifs, mais protégez vos ventes
MERCI DE VOTRE
  ATTENTION
          T                                 F
  T
       Sébastien VICENTE
       Chargé du secteur Industrie & Cleantech
       Bureau UBIFRANCE Indonésie – Jakarta
       Tél. : +62 (0) 21 23 55 73 83 Email :
       sebastien.vicente@businessfrance.fr
       www.ubifrance.fr/indonesie
C’est le moment
    des questions
    / réponses….
Vous pouvez aussi lire